New Irvington Tunnel Project
Extended Work Hours (24 hours-a-day 7 days-a-week)
November 5, 2012 through January 11, 2013
Project Update
Construction on the New Irvington Tunnel Project is more than half way complete! The tunnel will provide a seismically designed connection between our Alameda Watershed and Sierra Nevada water systems and our Bay Area customers. Winter time is upon us, which means it is shutdown time again.
Crews must construct upgrades to this water system while it still serves water to our customers. We need to shut down the pipelines in order to cut into them and weld pipeline connections. We can only do this for short periods of time during winter months when demand is low and we can still meet customer demand. We succeeded in completing a great deal of pipeline work during last winter’s shutdown, and look forward to making progress on this year’s planned shutdown as well. Because the timeline is short, we authorize our contractor to work 24 hours a day to complete the work.
What This Means
Beginning on November 5, 2012 through January 11, 2013, the contractor is authorized to conduct construction activities 24-hours per day 7-days per week at the Irvington Portal in Fremont.
What Can I Expect?
On weekdays from 7AM to 7PM and weekends from 8AM to 5PM construction activities will be no different from what is currently being experienced. Outside of those hours the contractor can only work on connecting the new tunnel to the Bay Division Pipelines. This work may include welding and surface excavation. The operation of construction equipment (loaders, excavators and cranes) is necessary to complete this work. Worker trips to and from the site at shift changes will also take place.
Will Work Take Place During the Holidays?
The contractor does not currently plan to work on Thanksgiving, Christmas or New Years Day. However, they have the ability to work on those days in order to complete their work within the extended work hour period. Residents will receive advanced notice if it becomes necessary to work on those days.
Questions?
Please call our 24-Hour Answer Line at 866.973.1476 or email fzamora@sfwater.org.
Monday, October 22, 2012
Tuesday, October 16, 2012
A Look Back at David, Dan and Mikey’s European Tunnel Adventure
New Irvington Tunnel
Project Manager David Tsztoo and Construction Manager Dan McMaster were invited
to a prestigious tunneling information and technical exchange with their
tunneling counterparts in Europe. Since they were on their own time, they
invited our Mikey to join them!
Where did the adventure begin? Mikey Likes It!
From France, Switzerland, Germany and Italy our intrepid travelers went deep underground to see some of the
world’s amazing tunneling projects.
Along the way they saw the world’s largest operating TBM in action,
toured the premier tunnel equipment manufacturing plant, experienced controlled detonations first hand, and made a lot of friends and contacts in the tunneling
industry.
Check out David, Dan and Mikey’s European Tunnel Adventure:
Where did the adventure begin? Mikey Likes It!
Tuesday, October 9, 2012
We are Building the Dam!
We are rocking out here at Calaveras Dam. Not so much to the sound of music but to the sweet sound of haul trucks loading and dumping rock fill. This week marks a big step towards building the new replacement dam. We dug down to the dam foundation back in August 2012 and we are now officially filling in rock material in the foundation for the new replacement dam. The fill material consists of rocks 30 inches in diameter, being moved at approximately 4,500 yards per day. Our bull dozers are equipped with GPS (global positioning system) units which detects the proper thickness levels as the materials are placed. The first phase of fill material will be completed at approximately 100 feet.
Haul truck places fill material into the Dam Foundation
Bulldozer uses GPS technology to level rock material for the replacement dam
Rendering of New Replacement Dam with first phase of rock fill being placed
(Not to scale)
For more project info, contact us at our 24 hour answer line at (866) 973-1476 or email mle@sfwater.org
Be Prepared!
Be Prepared!
The 23rd anniversary of the freeway-flattening Loma Prieta earthquake is coming up on October 17th. In the event of a similar emergency, will you be prepared? Will you have enough drinking water?
Make This October Emergency Preparedness Month!
The San Francisco Public Utilities Commission (SFPUC) operates the Hetch Hetchy Regional Water System, which provides high-quality drinking water to 2.6 million residents and businesses across four Bay Area counties. The SFPUC is making the investment to seismically upgrade regional water facilities, tunnels, and pipelines. However, it is important for you to remember that smaller pipelines leading to your home might be damaged in an earthquake. As a result, water from your tap may be unavailable for up to 72 hours or longer.
The San Francisco Public Utilities Commission (SFPUC) operates the Hetch Hetchy Regional Water System, which provides high-quality drinking water to 2.6 million residents and businesses across four Bay Area counties. The SFPUC is making the investment to seismically upgrade regional water facilities, tunnels, and pipelines. However, it is important for you to remember that smaller pipelines leading to your home might be damaged in an earthquake. As a result, water from your tap may be unavailable for up to 72 hours or longer.
To prepare for an emergency:
Keep a 3-day water supply just in case!
• Each family member needs 1 gallon per day
• Store tap water in food-grade plastic containers; replace every 6 months
• Store bottled water in the original sealed containers; replace according to expiration date.
• Each family member needs 1 gallon per day
• Store tap water in food-grade plastic containers; replace every 6 months
• Store bottled water in the original sealed containers; replace according to expiration date.
• Boil it for 3 minutes, or disinfect it by adding regular household bleach
• Add 8 drops of bleach per gallon of water
• Shake or stir then let it stand for 30 minutes
For more tips, view our emergency preparedness videos and website: http://www.sfwater.org/beprepared or follow @WSIPInTheNews.
Monday, October 8, 2012
First Flight at the Irvington Portal
The Ohlone Humane Society Wildlife Rehabilitation Center cares for injured, ill and sick wildlife found in the Bay Area. The center’s dedicated team of staff and volunteers was our first call when an injured immature red-tailed hawk was found during the construction of the New Irvington Tunnel (NIT).
Irv needed some help so the NIT team called the Ohlone Humane Society Wildlife Rehabilitation Center.
“Irv” was found with what appeared to be a broken wing (see image) by miners at the start of their morning shift. The crew promptly called our environmental team to determine the appropriate course of action with “Irv.” NIT’s environmental inspectors kept an eye on “Irv” and made sure construction and heavy equipment stayed away until the staff from the Wildlife Rehabilitation Center were able to arrive at the site.
Rehabilitating wildlife requires a lot of time and “Irv” spent two months in rehab. Staff and volunteers made sure “Irv” received both the medical attention and training he needed to survive in the wild. The red-tailed hawk is a bird of prey. So, in addition to learning how to fly again, “Irv” had to work on his hunting skills (particularly since he just recently fledged).
“Irv” was released this week near the location where he was found (given that it is probably the area he knows best). The NIT team paid him a visit, said their final goodbyes, and watched as he flew away. Check out “Irv’s” first flight back in the wild:
We wish “Irv” a happy journey and are thankful to the volunteers and staff at the Wildlife Rehabilitation Center for helping “Irv” get back into the wild as free-ranging hawk.
If you’re interested in learning more about the Ohlone Humane Society Wildlife Rehabilitation Center visit www.ohlonehumanesociety.org. In the meantime, meet Wesley - a barn owl who was guest at the center and is now a non-releasable, permanent resident of the Sulphur Creek Nature Center in Hayward.
Irv needed some help so the NIT team called the Ohlone Humane Society Wildlife Rehabilitation Center.
“Irv” was found with what appeared to be a broken wing (see image) by miners at the start of their morning shift. The crew promptly called our environmental team to determine the appropriate course of action with “Irv.” NIT’s environmental inspectors kept an eye on “Irv” and made sure construction and heavy equipment stayed away until the staff from the Wildlife Rehabilitation Center were able to arrive at the site.
Rehabilitating wildlife requires a lot of time and “Irv” spent two months in rehab. Staff and volunteers made sure “Irv” received both the medical attention and training he needed to survive in the wild. The red-tailed hawk is a bird of prey. So, in addition to learning how to fly again, “Irv” had to work on his hunting skills (particularly since he just recently fledged).
The NIT team and Mikey pay a visit to the Ohlone Wildlife Rehabilitation Center
NIT Team (L to R): David Tsztoo (Project Manager), Carrie Dovzak (Environmental Inspector), Michael Bumgardner (Project Biologist) and Mikey
Ohlone Staff: Sandra and Dave
“Irv” was released this week near the location where he was found (given that it is probably the area he knows best). The NIT team paid him a visit, said their final goodbyes, and watched as he flew away. Check out “Irv’s” first flight back in the wild:
Irv had a short first flight. After surveying the area for a half hour he took off over the Irvington Portal and headed east.
We wish “Irv” a happy journey and are thankful to the volunteers and staff at the Wildlife Rehabilitation Center for helping “Irv” get back into the wild as free-ranging hawk.
If you’re interested in learning more about the Ohlone Humane Society Wildlife Rehabilitation Center visit www.ohlonehumanesociety.org. In the meantime, meet Wesley - a barn owl who was guest at the center and is now a non-releasable, permanent resident of the Sulphur Creek Nature Center in Hayward.
Wednesday, October 3, 2012
Post #6: 72 hours, 2 tunnels, 3 time zones and countless new friends.
New Irvington Tunnel Project Manager David Tsztoo and Construction Manager Dan McMaster have been invited on a prestigious tunneling information and technical exchange with their tunneling counterparts in Europe. Since they are on their own time, they invited our Mikey to join them…. When last we left them they were in Switzerland.
Friday, Sept. 28:
Guten Morgen! Or is it Buon Giorno?! You can understand David, Dan and Mikey’s early morning confusion. Crisscrossing Europe can have that effect and the boys had to wake up early to catch two impressive Italian tunnels.
At the twin bore Galleria Sparvo Tunnel near Bologna, Italy, the trio was greeted by a 15.6 meter (51-foot) Herrenknecht-manufactured tunnel boring machine (TBM) – the largest TBM in the world. It’s the equivalent of 51 Mikeys tall!
Most impressive sight? Watching what’s best described as a hovercraft move the 2,500-ton Sparvo TBM. Mikey wasn’t the only one that liked that!
Down the road was the Galleria Val di Sambro Tunnel. Unlike Sparvo, crews used fiber glass pre-excavation face supports and a giant hole-ram to mine the 50-foot diameter tunnel full face. Pre-fabricated steel and shotcrete were installed to support the ground after excavation.
Now for you foodies, dinner was at the rustic Antica Trattoria La Grotta tucked into the hills surrounding Bologna. This fourth-generation family restaurant served our intrepid travelers a multi-course meal that featured slow-cooked braised pork.
Saturday Sept. 29th:
David, Dan and Mikey’s final day was a mix of technical presentations, sightseeing and fond goodbyes.
In the morning, the trio spent some time with the project managers of the Sparvo and Sambro tunnels and received briefings on current and upcoming tunnel projects in the United States.
The three spent the afternoon on a cultural tour of the historical center of Bologna and shopping for souvenirs. Mikey loved seeing how many old buildings were converted into shops, residential homes, and museums.
Finally, David, Dan, Mikey and tunneling experts from around the world gathered one final time over cheese, pasta and pork tenderloin. It was an evening of sharing stories, exchanging business cards and saying goodbyes to new friends.
Sunday, Sept. 30th:
The journey home started with a 4:00 AM wake up call. With their bags packed and passports in their pockets, David, Dan and Mikey boarded the early morning flight from Bologna. After layovers in Frankfort and London they made the trip back to San Francisco. Twenty-three hours later a very tired David, Dan and Mikey were back home.
Au Revoir. Auf Wiedersehen. Addio. It’s good to be home.
Want go back to where this adventure began? Check out: Mikey Likes It!
Friday, Sept. 28:
Guten Morgen! Or is it Buon Giorno?! You can understand David, Dan and Mikey’s early morning confusion. Crisscrossing Europe can have that effect and the boys had to wake up early to catch two impressive Italian tunnels.
At the twin bore Galleria Sparvo Tunnel near Bologna, Italy, the trio was greeted by a 15.6 meter (51-foot) Herrenknecht-manufactured tunnel boring machine (TBM) – the largest TBM in the world. It’s the equivalent of 51 Mikeys tall!
Most impressive sight? Watching what’s best described as a hovercraft move the 2,500-ton Sparvo TBM. Mikey wasn’t the only one that liked that!
Down the road was the Galleria Val di Sambro Tunnel. Unlike Sparvo, crews used fiber glass pre-excavation face supports and a giant hole-ram to mine the 50-foot diameter tunnel full face. Pre-fabricated steel and shotcrete were installed to support the ground after excavation.
Now for you foodies, dinner was at the rustic Antica Trattoria La Grotta tucked into the hills surrounding Bologna. This fourth-generation family restaurant served our intrepid travelers a multi-course meal that featured slow-cooked braised pork.
Saturday Sept. 29th:
David, Dan and Mikey’s final day was a mix of technical presentations, sightseeing and fond goodbyes.
In the morning, the trio spent some time with the project managers of the Sparvo and Sambro tunnels and received briefings on current and upcoming tunnel projects in the United States.
The three spent the afternoon on a cultural tour of the historical center of Bologna and shopping for souvenirs. Mikey loved seeing how many old buildings were converted into shops, residential homes, and museums.
Finally, David, Dan, Mikey and tunneling experts from around the world gathered one final time over cheese, pasta and pork tenderloin. It was an evening of sharing stories, exchanging business cards and saying goodbyes to new friends.
Sunday, Sept. 30th:
The journey home started with a 4:00 AM wake up call. With their bags packed and passports in their pockets, David, Dan and Mikey boarded the early morning flight from Bologna. After layovers in Frankfort and London they made the trip back to San Francisco. Twenty-three hours later a very tired David, Dan and Mikey were back home.
Au Revoir. Auf Wiedersehen. Addio. It’s good to be home.
Want go back to where this adventure began? Check out: Mikey Likes It!
Monday, October 1, 2012
Post #5 David, Dan & Mikey: Having a Blast in Switzerland!
New Irvington Tunnel
Project Manager David Tsztoo and Construction Manager Dan McMaster have been
invited on a prestigious tunneling information and technical exchange with
their tunneling counterparts in Europe. Since they are on their own time, they
invited our Mikey to join them…. When last we left them they were in Strasbourg,
France.
Thurs. Sept. 27th:
Most travelers to Sigirno leisurely browse through the cultural and natural attractions of this classically Swiss village…world class art museum, the Autumn Festival, or cruising Lake Lugano.
If you’re David, Dan and Mikey you might be looking for a little more action… maybe even explosive!
When our tunnel travelers visited the Alp Transit Gotthard Ceneri Base Tunnel near Sigirno, they weren’t going to find a single tunnel boring machine or road header on site. Instead the railway tunnel is driven in four headings simultaneously using mechanized drill and blast!
Deep underground a large rapid drilling machine is used to drill about a hundred holes in the tunnel face, and the holes are packed with explosives. When everything is set the detonations blast away several meters of rock off the face, crews remove the blasted rock, and the process repeats for the next round. David and Dan were certainly impressed and well Mikey… he likes it!
After all the excitement the three boarded a bus for the six hour drive to Bologna, Italy. David and Dan took this time to catch up on sleep. Not Mikey, though. He was his fun, energetic self, as usual.
What’s next for the crew? Two twin bore tunnels and a night in downtown Bologna.
Auf wiedersehen!
Before blasting in Switzerland Mikey huddled with the world's premier tunneling experts!
Thurs. Sept. 27th:
Most travelers to Sigirno leisurely browse through the cultural and natural attractions of this classically Swiss village…world class art museum, the Autumn Festival, or cruising Lake Lugano.
If you’re David, Dan and Mikey you might be looking for a little more action… maybe even explosive!
When our tunnel travelers visited the Alp Transit Gotthard Ceneri Base Tunnel near Sigirno, they weren’t going to find a single tunnel boring machine or road header on site. Instead the railway tunnel is driven in four headings simultaneously using mechanized drill and blast!
Deep underground a large rapid drilling machine is used to drill about a hundred holes in the tunnel face, and the holes are packed with explosives. When everything is set the detonations blast away several meters of rock off the face, crews remove the blasted rock, and the process repeats for the next round. David and Dan were certainly impressed and well Mikey… he likes it!
After all the excitement the three boarded a bus for the six hour drive to Bologna, Italy. David and Dan took this time to catch up on sleep. Not Mikey, though. He was his fun, energetic self, as usual.
What’s next for the crew? Two twin bore tunnels and a night in downtown Bologna.