Friday, August 31, 2018

Photo Friday from Sunol Long Term Improvements

Happy Photo Friday!

The team working on our Sunol Long Term Improvements Project has been tasked with constructing a new corporation yard and offices to house SFPUC Water Supply and Treatment and Natural Resources staff near Sunol. These new facilities replace the old corporation yard and buildings, which were aging and in need of upgrading.  The teams housed here operate the East Bay water system as well as monitor the rights of way and 35,000 acres of SFPUC-owned watershed lands.

We dedicate this photo Friday to the tremendous progress the team has made this year.



Here is a view of the new administration building.

Workers are installing a new bioswale to catch and absorb water run off at the site.








And, here is a very modern looking canopy for equipment to be installed outside of the shop.

The Sunol Long Term Improvement Project is 75% complete. The project is expected to be completed by the end of 2018. 

During construction, the Sunol Water Temple will remain closed to the general public.

We hope you have a great Labor Day weekend! See you around the Valley!

Thursday, August 23, 2018

Thank you, Jordan Erickson

Meet Jordan Erickson. He is a native of Maple Grove, Minnesota and was with us this summer as a student intern. Jordan is currently studying civil engineering at Iowa State University. During the summer. He was an integral part of the Sunol Yard Long Term Improvement Project team. Last week was his last week on the job.



He said that working as an intern for the SFPUC gave him a better perspective on the type of work he'll be doing in the future. One the most valuable things that it taught him was the importance of communication between the contractor and the owner.

When he is not busy working, Jordan enjoys playing sports and hanging out with his friends. We wish Jordan another successful year at Iowa State University.

Jordan is one of dozens of summer interns we at the SFPUC are delighted to host each summer. They are all fantastic, like Jordan. It is extremely important to help support the growth of future leaders in our industry.

The entire staff at the Sunol Yard Long Term Improvement Project would like to thank Jordan for all of his hard work.

See you around the Valley!





Friday, August 17, 2018

An Ode to Cows


Summer is fire season in the Sunol Valley and the Alameda Creek Watershed. And as fires blaze across Northern California, and flare up closer to home, we’re reminded of an unsung cadre of fire prevention specialists on SFPUC lands: Cows.



















Cows have grazed the Alameda Creek Watershed since the mid-1800s. Our Watershed Managers at the SFPUC use a twenty-first century approach to this century’s old tool to help minimize fire danger on the 36,000 acres of land we own in the Alameda Creek Watershed.

Our rangeland managers apply sustainable and cutting-edge cattle management practices, an the cows’ hungry habits do a great job of keeping the grasses low, which reduces the potential fuel for fires.

When driving through the watershed, please stay on paved areas and away from high grasses that could catch fire from the underside of your car.

And if, while you’re there, you happen to see any of our four-legged fire prevention team members, say thanks. For all of us.

For more local resources on fire safety:


See you around the Valley! And be fire safe out there.



Members our four-legged Fire Prevention Team near San Antonio Reservior. Their appetite keeps grasses from growing into a fire hazard. 

Friday, August 10, 2018

Meet the CAT-773

Our work at the Calaveras Dam Replacement Project wouldn’t be possible without the help of heavy equipment. Heavy equipment helps our team complete big tasks like moving 12 million cubic yards of rock and earth. Because of the size and scope of our project, we have the privilege of working with some big and cool heavy equipment on our job site.

On any given day we could have approximately 20 pieces of heavy equipment operating. Today I would like to introduce you to the CAT-773



Here is a picture of some of our equipment.


With a full load it can carry 100 tons of dirt or 200,000 pounds of material. This machine can climb steep roads and is very comfortable for the operator. It has a 12-cylinder engine that can reach 42 miles an hour.


















John Rocca, Field Operations Manager in front of a CAT-773.

It’s a real life Tonka truck. We have a total of 10 CAT-773’s on site hauling material and getting the job done.

 This equipment belongs to our Joint Venture (Dragados, Sukut and Flatiron), our partners on this project.

See you around the Valley!