A crucial job
that is integral to the design and construction of the Calaveras Dam
Replacement Project might surprise some: the driller. During the design phase of the project we
drilled more than 11,000 linear feet of core samples to characterize the
subsurface ground conditions in and around the location of the replacement dam.
And we didn’t
stop there. We are still drilling on the project to clarify the geologic
conditions specifically on the left abutment (or adjoining wall) of the future
new dam. Skill is key in exploratory
drilling. We are lucky to have incredible personnel on site. We’d like to
introduce you to one now - one of our lead drillers - Bay Area resident Will Halai. He has been performing this type of work on
construction projects for more than six years.
Will immigrated
to the United States in 1992 from Tonga, a country in the South Pacific, to
make a better life here for his family.
He works daily with his assistant Fine Taufatofua, also of Tongan
descent, who has been drilling for the last four years of his career. Both are members of the Operating Engineers
Local 3, the union which represents heavy equipment operators and construction
workers.
Typically, each
drill advances a bore hole 40 to 60 feet per day. The 4-inch diameter drill holes average about 100
feet in depth, while the rock core they extract is 2.5 inches in diameter. After the borings are drilled, many are
logged with a televiewer, which provides a continuous image of the inside of
the borehole to allow the identification (and orientation) of important
geologic features. On average, five to six
core borings are completed per week. All
of this information helps to ensure that the new Calaveras Dam, when built,
will sustain a maximum credible earthquake on the nearby Calaveras Fault.
Will works with Bill Henrich of Norcal
Geophysical during televiewer logging,
which is used to obtain important data from the core boring
which is used to obtain important data from the core boring
Union Local 3 Operating Engineers Will Halai
& Fine Taufatofua
pause from drilling work at Calaveras Dam
pause from drilling work at Calaveras Dam



