The extra hour of sleep this last weekend for Daylight Savings was wonderful.
These fall days have ended in some spectacular sunsets in the Sunol area.
Here is one we captured over Sheridan Valley, courtesy of Nella Terra.
Our crews are still working in the Valley and traveling along Calaveras Road, even in the dark early evenings. Please be careful out there.
See you around the Valley!
Friday, November 6, 2015
Tuesday, October 27, 2015
Creepy Crawlies at Calaveras Dam
Happy Halloween from the Calaveras Dam Replacement
Project!
The Sunol Valley is naturally decorated for Halloween thanks
to the “spooky” tarantulas coming out this time of year. That’s
right. It’s tarantula season and just in time for Halloween.
The California brown tarantula (Aphonopelma sp.) heads
out of its burrow at Calaveras Dam in search of romance.
After mating, the males tend to die a few months later.
By stark contrast, females live for 20 plus years in silk-lined
burrows. Talk about luxury!
And how many babies do these productive moms create?
The number ranges from 75 to hundreds per year.
Our goal is to keep these native species safe from harm
while we build the replacement Calaveras Dam. On a daily basis, our
environmental inspectors work closely with construction staff to identify any
wildlife on the move through the site.
Even the spooky ones!
See you around the Valley!
See you around the Valley!
Friday, October 16, 2015
Sunol's Own Shine at the Calaveras Dam Replacement Project
The $4.8 billion
Water System Improvement Program has generated millions of craft hours and
thousands of job opportunities for residents of the Bay Area counties served by the San Francisco Public Utilities Commission (SFPUC).
The SFPUC
Infrastructure Division’s Workforce and Economic Program Services Bureau works
closely with participating contractors to support their efforts to employ local
journey and apprentice workers on their projects.
To date, 48% of all workers
are residents of the agency’s 7-county service territory, which includes Bay
Area residents who receive SFPUC services or who are impacted as a result of
WSIP construction activity. Furthermore, 71% of all apprentice hours have been
worked by SFPUC service territory resident apprentices.
On the Calaveras
Dam Replacement Project, for example, three residents of Sunol have found
successful employment and professional development opportunities as a result of
this once-in-a-lifetime project. Two residents, Mr. Anthony DeValle and Mr.
Travis Hoxie, have recently completed their respective apprenticeship programs,
obtaining milestones such as advanced certifications and more than 3600 hours
of on the job training. Mr. Justin Gronley, also of Sunol, is nearing
completion of his apprenticeship training, and will soon “journey out”.
Mr. DeValle
expressed that, for him, the best part of achieving journeyman status is the
opportunity to reach back, “Helping to teach the younger kids by sharing
lessons I’ve learned from the more experienced workers.”
Mr. Hoxie agrees
that “passing it on” is a major benefit. Travis also liked “gaining more
education and developing one’s professional skills necessary to make it in the
construction industry.”
Some of the
skills and experience they highlighted while working on the Calaveras Project
were: environmental remediation, electrical work, tree cutting, concrete work,
dirt work, asphalt, power tools, carpentry, iron work, and traffic control.
They even learned complex skills such as rappelling as part of the complex
structural work.
Mr. Gronley is
especially grateful that the Calaveras project’s timing and location has
benefited him. “It’s nice to be able to succeed right out of high school,
participate on this project, and still be close to home.”
The Calaveras Dam
Replacement Project team would like to congratulate these hard-working
individuals on their recent success and express their gratitude for their
efforts, and the efforts of all of the workers and staff who are working on
this integral project of the WSIP program.
Calaveras Dam's newest journeymen from Left to Right:
Anthony DeValle; Travis Hoxie; Justin Gronley
Congratulations!
Tuesday, September 22, 2015
Sunol AgPark Harvest Festival Sunday, September 27, 2015
It may still feel like summer in the Sunol Valley, but, believe it or not, October is right around the corner!
Come join us to kick start the fall season at the Third Annual Sunol AgPark Harvest Festival.
Hosted by SAGE, the Sunol AgPark Harvest Festival features:
- Farm Fresh produce
- Food
- Live music
- Pumpkin patch
- Children's crafts and games
- And much more...
Plus drinking water provided by yours truly....
So bring your refillable water bottle, some sunscreen and your family and come on down!
Sunol AgPark
Harvest Festival
Sunday, September
27th, 10 am – 3 pm
505 Paloma Way, Sunol, CA
Learn more at SAGE's Website.
We hope to see you there!
Labels:
AgPark,
Farmers,
Harvest Festival,
Pumpkin Patch,
SAGE,
SFPUC,
Sunol
Thursday, September 17, 2015
Star Walk: Sunol Glen School Walk-A-Thon is On!
This Friday, September 18th is Sunol Glen
School’s 23rd Annual Walk-a-Thon!
We at the SFPUC are pleased and proud to be out there again this year
to provide drinking water and moral support to the student participants.
How can you show your support, you ask?
Visit www.sunolglencc.com to learn more!
Go Eagles!!
May the Force Be With You!
Labels:
SFPUC,
Sunol,
Sunol Glen school,
Walk-a-thon
Wednesday, September 9, 2015
Heat and High Fire Danger!
You do not need us to tell you that the weather has been unseasonably hot. Daytime temperatures are 10 to 20 degrees above seasonal averages throughout the Bay Area, according to the National Weather Service.
Because of the high heat and low moisture, our Natural
Resources and Lands Management Division has issued a high fire alert for the
Peninsula /Alameda Watershed lands that we own.
If you are driving in the area, please remember:
- Do not pull your car over to the side of the road in the grass. The heat from the underside of your car could quickly spark a grassfire. This is all too common.
- Please do not smoke, hold lit cigarettes out the window, or dispose of cigarette butts onto the side of the road.
- Please do not operate machinery in dry grasses that might generate sparks, including mowers.
For tips on how to stay safe in
this heat, please visit the National Weather Service’s website: http://www.nws.noaa.gov/om/heat/index.shtml.
Please stay hydrated and stay cool out there!
Please do not operate
machinery that might generate sparks, including mowers.
Labels:
Construction,
Fire Danger,
Heat Advisory,
Sunol Valley
Friday, July 10, 2015
One huge pipe at Calaveras Dam
As we busily work towards construction of a replacement Calaveras Dam, there are many fundamental issues we have to address. For example, given that the existing Calaveras Dam will be left in place when we are done, how will we be able to transport water out of the reservoir when the new dam is built?
Answer: We are building a large pipe (more than 7 feet in
diameter) that will be completely buried in the new dam that connects directly
to the outlet structure already in place in the existing dam.
This pipe will transport our drinking water supply from
the Calaveras Reservoir to the Sunol Valley Water Treatment Plant and then on
to our 2.6 million Bay Area customers when supplies are needed.
To date, our crews have installed 500 feet of the new
steel pipe, welded the joints, and
started building the formwork for reinforced concrete encasement around the entire pipeline to protect it. The
pipeline and encasement has been designed
to withstand the force of being buried under 180 feet of earth embankment as
well as the force of any seismic activity from the nearby Calaveras Fault. The team plans to connect the new 78 inch
pipe to the existing pipes within the existing dam in Fall 2016.
Seems a shame to put all this work into something that
will be completely buried under more than 3.5 million cubic yards of earth and
rock. But, thanks to these careful efforts, customers will be able to drink
Calaveras Reservoir water, even after an earthquake.
The new pipe is shown here in orange on the
layout, connecting to existing pipes in green.
The old pipeline in black is being abandoned to excavate the foundation
for the new dam.
Subscribe to:
Posts (Atom)







