stop by and check in on the progress of the new tunnel. Our project team
is available to answer your questions and listen to your comments.
Project Update
Over 12,593 feet (out of 18,660) has been tunneled to date. Workers completed the installation of 102-inch diameter steel pipe at the Irvington Portal that will eventually carry drinking water from the Hetch Hetchy system to 2.6 million Bay Area customers.
Over 12,593 feet (out of 18,660) has been tunneled to date. Workers completed the installation of 102-inch diameter steel pipe at the Irvington Portal that will eventually carry drinking water from the Hetch Hetchy system to 2.6 million Bay Area customers.
Installation
of the waterline connection to the new tunnel at Irvington Portal near Mission
Boulevard continues. We expect the
connection fully installed by January 11, 2013.
The
New Year will also begin the countdown to the completion of tunneling. Excavation is scheduled for completion
mid-2013. The steel pipe liner will go
into the last sections of the tunnel by the Fall of 2013.
We look forward to seeing you at the open house!
We look forward to seeing you at the open house!
Please
call 866-973-1476 or email fzamora@sfwater.org for
more
information. You can also visit www.sfwater.org/nit or
www.sfwater.org/sunolvalley
for project updates.
No comments:
Post a Comment